国际货币基金组织:2024年乌干达技术援助报告:在人力资本和基础设施发展方面实现可持续发展目标的成本(英文版).pdf |
下载文档 |
资源简介
The mission estimates that making substantial progress in critical SDG sectors in Uganda would require additional annual spending of about 18.4 percent of gross domestic product (GDP) by 2030. Relative to low-income developing countries (LIDCs), additional spending in Uganda is higher in the social sectors and lower in the infrastructure sectors (Figure). Overall, Uganda’s additional spending is above the median LIDC and similar to the median Sub-Saharan African (SSA) country. (This analysis
本文档仅能预览20页