安联Allianz:2025年大而美数据中心:AI与基础设施如何为疲软的建筑业注入新活力报告(英文版).pdf |
下载文档 |
资源简介
Generative AI has become a structural driver of construction. The global AI boom is fueling a frenzy for data centers. In the US, 6.4 GW of data center capacity was under construction at end-2024, double the level of 2023. This alone represented about USD74bn of construction spending (i.e. excluding land, equipment, software etc.). EMEA’s pipeline surged +43% y/y to close to 14 GW in planning by mid-2025 (i.e. equivalent to about EUR170bn in construction spending) and China’s IT load is set t
本文档仅能预览20页