RatedPower:2025年意大利电网的现代化:Ternas 230亿欧元的投资对太阳能和储能意味着什么(英文版).pdf |
下载文档 |
资源简介
Terna's plan outlines dozens of infrastructure upgrades tomove ltaly closer to a secure and flexible energy system.Some of the most consequential upgrades are already inmotion, with several scheduled to come online by 2030:The Tyrrhenian Link (a 500 kV high-voltage submarinecable)will tie Sicily to both Campania and Sardinia by2028.The east branch received approval in 2022, andthe first cables were laid in early 2024.Further north, the Adriatic Link will connect Abruzzoand Marche through
已阅读到文档的结尾了