香港特别行政区政府:2020年香港绿色债券报告(英文版).pdf |
下载文档 |
资源简介
The Integrated Waste Management Facilities (IWMF) aims to substantially reduce the bulk size of MSW and recover useful resources. The IWMF will be developed in phases. IWMF Phase 1 is located in an artificial island of about 16 hectares near Shek Kwu Chau (SKC) and is expected to be fully commissioned by 2025. It will have a treatment capacity of 3 000 tonnes of MSW in total each day and adopt advanced incineration as the core treatment technology. IWMF Phase 1 will also be equipped with a me
本文档仅能预览20页